The project bench / Class 01
Marble
tic-tac-toe.
A pocket game block with nine marble wells on top, two storage tunnels in the side, and a swivel latch that locks the marbles in. Built from one 3½″ cut of pine 2×4 with a saw, a brace and a screwdriver.
October 18 · Wonch Park Pavilion, Okemos · $75 per child.


- Build steps
- 6
- Holes · 9 wells + 2 tunnels
- 11
- Marbles · 5 light, 5 dark
- 10
- Power tools
- 0
More than a game
“I made that.”
“I can do this.”
Making them more confident is the real end goal. A small block of wood gives them something real to measure, make, test, and take home.
Measure & mark
Read a ruler, lay out a true square, and transfer a nine-hole grid.
Use real hand tools
Practice sawing, boring, clamping, and fastening with guidance.
Work with a partner
Take turns as Pilot and Spotter, helping each other keep the bit straight.
Test what they made
Fit five marbles in each tunnel, swing the latch, then play a game.
From a pine 2×4 to a pocket game
One block.
Six steps.
Follow the project from the first cut to the final sanding. Open a step for the tools, measurements, and work instructions.
01Crosscut the base to a true square
Miter box · backsaw · rule
Mark 3-1/2" from the factory end · Result: 3-1/2" × 3-1/2"
Measure and mark exactly 3-1/2" from the clean factory-cut end of the 2×4, so the finished block is a true 3-1/2" × 3-1/2" square. Clamp the board in the miter box. Have the student hold the saw level with two hands and take 2–3 smooth pull strokes to start the kerf, then settle into steady, rhythmic strokes.
02Transfer the hole grid and punch
Cardstock template · center awl
9 wells · 1" on center · 3/4" margins · 2 tunnels · 3/4" up · 1-1/8" in
Lay the pre-perforated 3-1/2" square template over the top face and mark the 9 well locations. Turn the block to the chosen storage edge and mark the 2 tunnel centers, 3/4" from the bottom face and 1-1/8" in from each edge. Press firmly with the awl at every mark — the dimples stop the bits wandering.
03Bore the 9 top game wells
Brace · 3/4" Forstner bit · tape depth stop
Tape 3/8" above the spurs · Stop at the tape
Wrap blue tape on the 3/4" bit shank 3/8" above the spurs. Clamp the block flat in the wooden hand screw, then clamp the hand screw to the bench. One student cranks clockwise while their partner spots for vertical from the side. Stop the moment the blue tape grazes the pine.
Free hand on the brace, always. The student's second hand stays on the top breastplate or knob of the brace. Never hold the work by hand while drilling. The clamped hand screw does 100% of the holding.
04Bore the internal marble tunnels
Hand screw clamp · 3/4" auger bit
Tape at 3-1/8" deep · 3/8" solid at the rear · Clear chips every 4–5 turns
Turn the block so the storage edge faces straight up, and clamp it deep inside the hand screw jaws so it cannot split along the grain.
Wrap painter’s tape on the auger bit at 3-1/8" deep, leaving 3/8" of solid wood at the rear.
Let the lead screw draw the bit into the pine. Do not push down hard.
Back the bit out every 4–5 turns to clear chips from the flutes. Test-fit 5 marbles in each tunnel.
05Shape the latch and drill its clearance hole
Sanding block · 3/16" twist bit
120 grit · round 4 corners · 3/16" hole, dead center
Take the pre-ripped 1" × 3-1/4" latch strip and round all four corners with 120-grit into a smooth pill shape. Mark the exact center and bore a 3/16" clearance hole, so the screw shank turns freely without biting into the latch.
06Mount the swivel latch and finish
Screwdriver · 1/8" pilot bit · beeswax
Pilot 1/8" × 1" deep · Screw → washer → latch → block
Hold the latch horizontal across both tunnels and mark the block center through the clearance hole. Drill a 1/8" pilot hole 1" deep into the block. Assemble in order: screw, washer, latch, block. Tighten until snug, then check the latch swings smoothly between closed (horizontal) and open (vertical).
Ease every block corner with 120, then 220 grit, sanding to a smooth finish.
Done when
Five marbles fit in each tunnel, and the latch swings smoothly between closed (horizontal) and open (vertical).
The block, measured
Small block.
Clever storage.
Wells sit 1″ on center with ¾″ margins all round. Two tunnels hold the marbles. One swivel latch keeps everything together.
Measure from the clean factory-cut end of the 2×4. The latch screw goes dead center on the storage edge, between the two tunnels.
- Game wells
- ¾″ Forstner · ⅜″ deep
- Storage tunnels
- ¾″ auger · 3⅛″ deep
- Latch clearance
- 3/16″ twist · through the latch
- Latch pilot
- ⅛″ bit · 1″ into the block
Tunnel centers are ¾″ up from the bottom face and 1⅛″ in from each edge. Leave ⅜″ solid at the rear.
Their first “I made that” starts here
Let’s get
them making.
Interested in marble tic-tac-toe for your child or your group? Tell us your town and we’ll follow up as workshops take shape.
This project is planned for Ages 7–10. Our October 18 classes are at Wonch Park Pavilion in Okemos: $75 per child, six places per session. Use the class booking page to choose a time and register when booking opens. This newsletter and inquiry form does not reserve a seat.
Bring this project to your groupBuild something. Surprise yourself.
Keep me in the loop.
Be first to hear about classes near you.